Designed specifically for complex EPC, software engineering, and multi-disciplinary infrastructure projects. Seamlessly integrate contract BOQ, dual-mode resource allocations, high-precision task weighting, interactive Gantt charts, and weekly EVM deviation tracking.
Why enterprise EPC and IT engineering firms hit a dead end with generic kanban boards and checklists.
Eliminate scope creep before kicking off execution. Manpow enforces an enterprise project governance baseline binding legal contracts, multi-tier payment milestones, project charters, and formal administrative compliance.
Document background objectives, precise deliverables, and legal boundaries (Project Charter) with configurable PDF export.
Tie contract pagu to phased billing milestones (Uang Muka, Termin 1-3, Retensi) coupled with BAPP handover sign-off status.
Track NDAs, SPMK, BAMK, and contractual amendments with clause dates and active validity alerts.
| Termin Phase | Deliverable / BAPP | Pagu (Rp) | Status |
|---|---|---|---|
| Termin 1 (20%) | Project Charter & SRS Approved | 970.000.000 | Paid / Lunas |
| Termin 2 (30%) | Core System & UAT Handover | 1.455.000.000 | BAPP Fullsign |
| Termin 3 (40%) | Infrastructure Deployment | 1.940.000.000 | In Review |
| Retensi (10%) | BAST-2 & Final Maintenance | 485.000.000 | Pending |
Break down master contract budgets into structured resource classes. Bridge high-level commercial bill-of-quantities directly to technical line items without spreadsheet discrepancies.
Classify requirements into 6 standard categories: Manpower (SDM), Hardware, Software & Licensing, Cloud & Server, Services, and Other Direct Costs.
Centralize cost rates per Mandays, Manmonths, Device Units, Monthly Cloud Subs, or Lump Sum contracts with role standards.
Decompose broad BOQ budget lines into granular project sub-items with unit price formulas and exact quantity limits.
| Resource Item | Category | Qty / Unit | Rate | Total Pagu |
|---|---|---|---|---|
| Senior Solution Architect | SDM | 60 Mandays | Rp 4.500.000 | Rp 270.000.000 |
| Lead Backend Engineer | SDM | 120 Mandays | Rp 3.200.000 | Rp 384.000.000 |
| Enterprise Edge Switch 48P | Hardware | 4 Unit | Rp 48.000.000 | Rp 192.000.000 |
| Oracle DB Enterprise License | Software | 1 Core Lic | Rp 320.000.000 | Rp 320.000.000 |
| Baremetal Server AWS Cluster | Cloud | 12 Bulan | Rp 18.500.000 | Rp 222.000.000 |
Not all projects are delivered the same way. Manpow provides two mathematically synchronized allocation engines tailored for physical engineering and digital development.
Directly assign personnel, materials, and heavy equipment to specific WBS tasks. Automatically distributes cost across task duration based on calendar days.
Allocate expert mandays directly into a dynamic weekly effort matrix (e.g. 5.0 Mandays/Wk). Automatically rolls up into task budgets and cross-project personnel matrices.
| Assigned Personnel | Role / Rate | W1 | W2 | W3 | W4 | Total Days |
|---|---|---|---|---|---|---|
|
Budi Prasetyo
Task 1.2 Database Schema
|
Lead DB • 3.2M | 5.0 | 5.0 | 3.0 | - | 13.0 MD |
|
Hendra Wijaya
Task 2.1 API Development
|
Backend • 2.8M | - | 5.0 | 5.0 | 5.0 | 15.0 MD |
|
Siti Rahmawati
Task 2.3 UI Integration
|
Frontend • 2.5M | - | - | 4.0 | 5.0 | 9.0 MD |
Gain seamless spatial control over your project roadmap. High-performance dhtmlx Gantt visualizes critical paths, auto-calculated date boundaries, and parent-child dependencies at a glance.
View multi-level WBS nodes with collapsible parent groups, live progress bars, and cost indicators.
Switch effortlessly between Daily (Year-Month-Day), Weekly (W1, W2, W3...), and Monthly (Quarter-Month) viewing scales.
Parent task start and end dates automatically calculate from the minimum start and maximum finish of their child work packages.
Execute daily operations through your preferred operational lens. Track milestone compliance via formal weekly progress audits or agile drag-and-drop workflow boards.
Audit work packages week by week. Input actual progress percentages, log qualitative field notes, and generate formal weekly progress reports.
Drag and drop cards across lifecycle columns (To Do, In Progress, Review / Testing, Done) or filter instantly by Assigned PIC and Phase.
Unlike generic boards where every card equals 1 point, Manpow calculates progress weighted strictly by task budget: Σ(Progress × Cost) / Σ(Cost).
Zero surprises at handover. Monitor cumulative plan versus actual progress curves, detect critical schedule deviations weeks in advance, and resolve operational blockers with SLA-driven issue tracking.
Visualizes planned baseline curve against actual earned value progress week by week, identifying positive progress or dangerous project lag.
Audit exact variance percentage and days of delay per WBS node for proactive PM intervention.
Log blockers directly linked to tasks. Track category (Technical, Material, Client Approval), severity level, impact delay days, and designated PIC resolutions.
| Issue Code | Related Task | Severity | Assigned PIC | Status |
|---|---|---|---|---|
| ISS-004 | 1.2 Hardware Delivery Delay | Critical | Fajar Ramadhan (Logistics) | Open |
| ISS-003 | 2.1 Firewall Port Re-routing | Medium | Gilang Pratama (Network) | In Progress |
| ISS-002 | 1.1 User Persona Approval | Low | Sarah Utami (PM) | Resolved |
Experience the difference of structured BOQ budgeting, dual-mode allocation, and S-Curve governance in Manpow.